Orem Business Complex

April 2024
Trench & Pipe (x2) to existing drain
Patching: 160 sq ft (2 trenches)

Orem Residence

April 2024
Base: 3,424 sq ft (4")
Paving: 3,424 sq ft (3")

Spanish Fork 4-Plexes

Spanish Fork 4-Plexes

June 2023
Paving: 1,799 sq ft (3")

South Jordan HOA

South Jordan HOA

April 2023
Sawcutting: 40 lin ft
Patching: 140 sq ft (2 patches)

Bountiful Residence

Bountiful Residence

May 2021
Sawcut/Mill: 50 lin ft
Patching: 860 sq ft (6 patches)
Paving: 2,625 sq ft (3")
Overlay: 6,966 sq ft (2")
Crackseal: w/flat edges
Sealcoat: 2,800 sq ft

Orem 4-Plex

Orem 4-Plex

May 2021
Sawcutting: Yes
Base: 4,200 sq ft (4")
Paving: 4,200 sq ft (3")
Parking Blocks: 9 parking blocks
Striping: new layout - minimum

Farmington Residence

Farmington Residence

May 2021
Base: Remove gravel, compact existing base
Paving: 3,928 sq ft (3")

Murray Residence

Murray Residence

October 2020
Concrete Removal: 700 sq ft
Base: 2,326 sq ft (4")
Paving: 2326 sq ft (3")

Midway Bed & Breakfast

Midway Bed & Breakfast

October 2020
Base: Re-work base and grade
Paving: 5,400 sq ft (3")